NEA4201 Building Systems and Costing
Group Assignment Part 2
Submission Date: Monday Week 10 Value 20%
Total number of works approx. 3000 excluding references and appendix
Part A – 40%
1. Thinking only about mechanical services, what are the requirements for spatial provisions in a typical
multi-storey building in relation to:
plantrooms;
main risers (duct and pipe risers, electrical risers for mechanical services, control wiring);
ceiling spaces;
in false floor areas?
2. List specialist mechanical services that are implemented in some buildings as a result of tenants’
requirements.
3. Considering various stages of project development (concept, design development, final design,
construction, testing and commissioning, maintenance during normal operation), list criteria for
establishing spatial provision requirements.
4. Who needs to be involved in the planning for successful coordination of mechanical services over the life
of a building?
5. How do you think authority requirements will affect the design of mechanical services?
6. What impact would the events of 9/11 in your opinion have on building design, construction and operation
issues? Consider services and structural design perspectives.
Part B – 40%
1. Why is it a necessity to ensure successful design and construction coordination?
2. What are the main coordination requirements between mechanical services and:
electrical services;
fire protection and fire safety services;
communication and security services;
hydraulic services;
transportation services?
3. What are the main coordination requirements between mechanical services and structural design?
4. What aspects of mechanical services design require coordination with the architect?
5. Provide a detailed check list for mechanical services specific to buildings incorporating ESD principles (in
addition to those needed in ‘traditional’ buildings).
Part C – 20%
1. List elements needed to develop a successful coordination and integration strategy for a building. Consider
both design and construction stages.
2. Find 10 good internet resources that discuss mechanical services integration. Provide an annotated
bibliography (two to three paragraphs per website, indicating why a particular website is useful and what is
lacking). Remember to use Harvard referencing style.
NEA4201 Building Systems and Costing
NEA4201 Building Systems and Costing
Group Assignment Part 2
Submission Date: Monday Week 10 Value 20%
Total number of works approx. 3000 excluding references and appendix
Part A – 40%
1. Thinking only about mechanical services, what are the requirements for spatial provisions in a typical
multi-storey building in relation to:
plantrooms;
main risers (duct and pipe risers, electrical risers for mechanical services, control wiring);
ceiling spaces;
in false floor areas?
2. List specialist mechanical services that are implemented in some buildings as a result of tenants’
requirements.
3. Considering various stages of project development (concept, design development, final design,
construction, testing and commissioning, maintenance during normal operation), list criteria for
establishing spatial provision requirements.
4. Who needs to be involved in the planning for successful coordination of mechanical services over the life
of a building?
5. How do you think authority requirements will affect the design of mechanical services?
6. What impact would the events of 9/11 in your opinion have on building design, construction and operation
issues? Consider services and structural design perspectives.
Part B – 40%
1. Why is it a necessity to ensure successful design and construction coordination?
2. What are the main coordination requirements between mechanical services and:
electrical services;
fire protection and fire safety services;
communication and security services;
hydraulic services;
transportation services?
3. What are the main coordination requirements between mechanical services and structural design?
4. What aspects of mechanical services design require coordination with the architect?
5. Provide a detailed check list for mechanical services specific to buildings incorporating ESD principles (in
addition to those needed in ‘traditional’ buildings).
Part C – 20%
1. List elements needed to develop a successful coordination and integration strategy for a building. Consider
both design and construction stages.
2. Find 10 good internet resources that discuss mechanical services integration. Provide an annotated
bibliography (two to three paragraphs per website, indicating why a particular website is useful and what is
lacking). Remember to use Harvard referencing style.
NEA4201 Building Systems and Costing
NEA4201 Building Systems and Costing
Group Assignment Part 2
Submission Date: Monday Week 10 Value 20%
Total number of works approx. 3000 excluding references and appendix
Part A – 40%
1. Thinking only about mechanical services, what are the requirements for spatial provisions in a typical
multi-storey building in relation to:
plantrooms;
main risers (duct and pipe risers, electrical risers for mechanical services, control wiring);
ceiling spaces;
in false floor areas?
2. List specialist mechanical services that are implemented in some buildings as a result of tenants’
requirements.
3. Considering various stages of project development (concept, design development, final design,
construction, testing and commissioning, maintenance during normal operation), list criteria for
establishing spatial provision requirements.
4. Who needs to be involved in the planning for successful coordination of mechanical services over the life
of a building?
5. How do you think authority requirements will affect the design of mechanical services?
6. What impact would the events of 9/11 in your opinion have on building design, construction and operation
issues? Consider services and structural design perspectives.
Part B – 40%
1. Why is it a necessity to ensure successful design and construction coordination?
2. What are the main coordination requirements between mechanical services and:
electrical services;
fire protection and fire safety services;
communication and security services;
hydraulic services;
transportation services?
3. What are the main coordination requirements between mechanical services and structural design?
4. What aspects of mechanical services design require coordination with the architect?
5. Provide a detailed check list for mechanical services specific to buildings incorporating ESD principles (in
addition to those needed in ‘traditional’ buildings).
Part C – 20%
1. List elements needed to develop a successful coordination and integration strategy for a building. Consider
both design and construction stages.
2. Find 10 good internet resources that discuss mechanical services integration. Provide an annotated
bibliography (two to three paragraphs per website, indicating why a particular website is useful and what is
lacking). Remember to use Harvard referencing style.
Leadership style in health and nursing
Business Research: Information Sources
What are the five factors a manager should consider when evaluating an information source? Explain each one. Explain the five steps in conducting a literature search. What are the three types of evidence a research seeks when testing causal hypotheses? Explain. Explain the difference between a field setting, laboratory setting, and simulation.
\
Cross-border competition
1. How can a country’s sustainable development policy become a critical factor for the success or failure of any given project? 2. Which are the main consequences of cross-border competition and regulatory cooperation in the transatlantic marketplace? 3. While in the host country, how do I address potential problems related to a dual-use widget produced for export?
Explain how a voter's social class can affect his or her voting
A. Explain how a voter’s social class can affect his or her voting practices. B. Discuss the difference between how conflict perspective sociologist and functionalist perspective sociologist view politics and government. Which perspective in your opinion give the most accurate vantage point on politics and government.
socializing agents
Business research designs methods
Research designs are classified as communication or observation by the approach used to gather primary data. Identify five conditions under which observation is an appropriate method for data collection. Describe the strengths and limitations of observation as a data collection method. What are some of the responsibilities of interviewers aside from conducting the actual interviews? How can researchers increase the confidence business decision makers have in qualitative data?
Diversification Strategies – Target Corporation
Compare and contrast the different diversification strategies being used by Target Corporation and competitors within the discount variety retail industry. Recommend a diversification strategy that best fits the discount variety retail industry.